Home/projects/marathon unit 10 revamp/turnover
Marathon Petroleum / Garyville, LA

Marathon Refinery — Unit 10 Revamp

Revamp of crude unit 10 with new charge pumps and upgraded ICSS.

Systems
3
Subsystems
6
Open A
2
Open B
1
MC83%
RFSU53%
Comm.37%
Handover12%
Learn: Turnover & Handover
Tap a topic — Why · How · What · Drivers. Hover any abbreviation for its meaning.

Turnover & Handover

Turnover Phases

PHASE 1
Subsystem MC certificate
PHASE 2
RFSU certificate
PHASE 3
Commissioning complete
PHASE 4
Operations acceptance
PHASE 5
Care, Custody & Control
Subsystem1. Subsystem MC certificate2. RFSU certificate3. Commissioning complete4. Operations acceptance5. Care, Custody & ControlProgressStatus
IA Compressor Package
20-IA · 20-IA-001
0%grey
IA Dryers
20-IA · 20-IA-002
0%grey
IA Distribution Network
20-IA · 20-IA-003
0%grey
P-1001 A/B Train
10-PUM · 10-PUM-001
0%grey
ICSS Cabinet Room
70-ICSS · 70-ICSS-001
70%amber
F&G Loops Unit 10
70-ICSS · 70-ICSS-FG-10
0%grey
Turnover & Handover progress weightingIndustry default
Basis: MC and RFSU certificates dominate acceptance. Care-Custody-Control closes the legal handover and carries lower technical weight.
Sources: Shell DEP 80.00.10.11 · IOGP JIP33 handover protocols
Subsystem MC certificate
25%
default 25%
RFSU certificate
25%
default 25%
Commissioning complete
20%
default 20%
Operations acceptance
20%
default 20%
Care, Custody & Control
10%
default 10%
All changes saved
Why this matters
Operations cannot accept the entire plant in one go. Phased turnover transfers care, custody & control subsystem by subsystem. Each tick is a contractual gate.
Common field problems
Dossiers incomplete (missing as-builts, vendor manuals); operations refuses to sign because punches not reconciled; ambiguity over who maintains preservation post-MC.
Best practice
Build the dossier as you go — never at the end; require operations witnessing from MC walkdowns; export the Handover Dossier and walk it system-by-system with the asset team.