Completions & Commissioning Pro
A field-execution platform for EPC completions, mechanical completion (MC), commissioning, and turnover on oil & gas, refinery, petrochemical, LNG, offshore, FPSO, pipeline, and utility projects. It replaces the tangle of spreadsheets, PDFs and emails that completions teams normally use to drive a project from construction to operations.
Who it is for
- ▸Completions Managers & Commissioning Managers
- ▸Systems Completion Engineers
- ▸Discipline Engineers (Piping, E&I, Mechanical, F&G)
- ▸Construction & QA/QC Supervisors
- ▸Operations Readiness & Start-up Teams
- ▸EPC Project Controls & Turnover Coordinators
What it does
Systemization
Break the project into systems and subsystems with disciplines, priority, tags, and turnover boundaries — the foundation every other module uses.
Preservation
Track equipment lay-up, preservation intervals, and overdue actions so rotating equipment and instruments don't degrade before start-up.
Punch List
Manage Category A/B/C punches by discipline, system and responsibility. A-punches block MC; B/C are tracked through start-up.
Mechanical Completion
Walkdown, hydrotest, flushing, reinstatement, preservation and A-punch checks per subsystem with a one-click MC dossier.
Commissioning
Energization sequence, loop checks, function tests, cause & effect, and dynamic testing per subsystem with RAG status.
Turnover & Handover
Phased handover (RFSU → RFO → Care, Custody & Control) with witness sign-off and outstanding work captured.
Documentation
Per-project document register for ITRs, certificates, vendor packs and final dossiers.
Workflow Engine
A connected execution flow — Construction → MC → Pre-comm → Commissioning → Start-up → Handover — with gate criteria.
How it works in practice
- 1Create a projectOperator, site, project type, and scope description.
- 2Define systems & subsystemsSet boundaries, disciplines, priority and tags.
- 3Run preservation & raise punchesCapture defects from walkdowns; keep preservation alive during lay-up.
- 4Drive subsystems through MCClose A-punches, complete walkdown / hydrotest / flushing, declare MC.
- 5Commission and energiseLoop check, function test, dynamic run — by subsystem, in sequence.
- 6Hand over to operationsRFSU → RFO with witness sign-off and final dossier.
What this app is NOT
- ▸Not a training course or e-learning handbook
- ▸Not a generic project management / Gantt tool
- ▸Not a document management system replacement
- ▸Not a CMMS (it complements, doesn't replace SAP/Maximo)
Why it exists
On industrial projects, the gap between “construction finished” and “plant producing” is where schedules slip and budgets blow out. Completions, MC, commissioning and turnover are usually run on disconnected spreadsheets, with no shared view of subsystem readiness, punch posture or preservation status. This app gives the completions team one execution surface — built around how EPC projects actually run — so handover decisions are driven by data, not opinion.